Projects
Fordyce Construction encourages all trade subcontractors to take affirmative steps to utilize MBE/WBE/DBE/OBE/DVBE/SLBE/ELBE businesses. If you are in need of assistance regarding bonding, insurance or credit lines, please contact our office. Assistance is available to interested subcontractors in obtaining necessary equipment, supplies or materials.
Plans, Specs & Addendum are provided as a courtesy only. We make every effort to keep our data current. We do not warranty the accuracy of what is posted. It is the subcontractors responsibility to review all plans, specs and addenda with the issuing agency.
Subcontract labor, material and performance bonds are required for any subcontract value over $100,000 and may be required for subcontracts valued at less than $100,000. Bond premiums will be reimbursed by Fordyce Construction, Inc., unless already included in the subcontract proposal.
| Project # | 26169 |
| Project Name | Ramona Air Attack Base |
| Project Owner | CAL FIRE (State of California, Dept. of Forestry and Fire Protection) |
| Bid Date | November 2, 2026 |
| Bid Time | 5:00 PM |
| Invitation | Bid Invitation |
| Notes | Construct two new helipads with updates to landscape and concrete driveway – site demo, grading, landscaping, concrete flat work (FAA P-501 PCC paving, P-209 base), stormwater drainage (V-ditch + StormTrap connection), erosion control. Coordinate with San Diego County / Ramona Airport management for work times and taxiway access. |
| Plans, File 1 | Plans.pdf |
| Plans, File 2 | Bid Package.pdf |
| Addendums | Contact office for availability of addendums. |
| Resources | Contact office for availability of additional resources. |