Projects
Fordyce Construction encourages all trade subcontractors to take affirmative steps to utilize MBE/WBE/DBE/OBE/DVBE/SLBE/ELBE businesses. If you are in need of assistance regarding bonding, insurance or credit lines, please contact our office. Assistance is available to interested subcontractors in obtaining necessary equipment, supplies or materials.
Plans, Specs & Addendum are provided as a courtesy only. We make every effort to keep our data current. We do not warranty the accuracy of what is posted. It is the subcontractors responsibility to review all plans, specs and addenda with the issuing agency.
Subcontract labor, material and performance bonds are required for any subcontract value over $100,000 and may be required for subcontracts valued at less than $100,000. Bond premiums will be reimbursed by Fordyce Construction, Inc., unless already included in the subcontract proposal.
| Project # | 26173 |
| Project Name | OPMS Wellness Center Project |
| Project Owner | Ramona Unified School District |
| Bid Date | November 16, 2026 |
| Bid Time | 10:00 AM |
| Invitation | Contact office for copy of bid inivitation |
| Notes | Remodel an existing classroom into a new Wellness Center – demo of existing cabinets, sinks and lighting; new interior wood-stud walls, clerestory, acoustic panels/suspended ceilings, LVT flooring, casework, new sink (re-use plumbing), lighting w/ controls, power, communications, fire alarm modifications, and redirecting HVAC ventilation. 26 plan sheets (Arch, M, P, E) by Lord Architecture. DSA project – DSA Class 2 Project Inspector and District-hired testing lab; Contractor responsible for DSA close-out (GC §8). |
| Plans, File 1 | Plans.pdf |
| Plans, File 2 | Bid Package.pdf |
| Plans, File 3 | Notice Inviting Bids.pdf |
| Addendums | Contact office for availability of addendums. |
| Resources | Contact office for availability of additional resources. |